Skip to main navigation menu Skip to main content Skip to site footer
×
Español (España) | English
Editorial
Home
Indexing
Original

Proposal for a protection system of an industrial electrical network

By
Alex Paúl Cruz Gonzales ,
Alex Paúl Cruz Gonzales

Facultad de Ciencias de la Ingeniería y Aplicadas, Universidad Técnica de Cotopaxi, Cotopaxi, Ecuador

Search this author on:

PubMed | Google Scholar
Xavier Santiago Salazar Defaz ,
Xavier Santiago Salazar Defaz

Facultad de Ciencias de la Ingeniería y Aplicadas, Universidad Técnica de Cotopaxi, Cotopaxi, Ecuador

Search this author on:

PubMed | Google Scholar
Xavier Alfonso Proaño Maldonado ,
Xavier Alfonso Proaño Maldonado

Facultad de Ciencias de la Ingeniería y Aplicadas, Universidad Técnica de Cotopaxi, Cotopaxi, Ecuador

Search this author on:

PubMed | Google Scholar
Franklin Hernán Vásquez Teneda ,
Franklin Hernán Vásquez Teneda

Facultad de Ciencias de la Ingeniería y Aplicadas, Universidad Técnica de Cotopaxi, Cotopaxi, Ecuador

Search this author on:

PubMed | Google Scholar

Abstract

An electrical protection system in an industry Works by detecting and acting against abnormal conditions in the electrical system with the objective of guaranteeing the safety of people, protecting equipment and ensuring the continuity of industrial process. Taking into account the importance of guaranteeing adequate electrical protection system in an industrial activity in this research a proposal for the protection system for an industrial electrical network is presented. As a previous step proposal, the methodology desingned for the coordination of protections for an industrial electrical network was proposed. The proposal was designed taking into account four operating scenarios required to calibrate the industry’s protection devices. The short circuit analysis maximum in each of the system bars for each of the scenarios allowed determining the maximum phase failure currents it is 44.44% for emergency 1 and 66.66% for emergency 2, while the maximum ground fault current was founding emergency scenario2. At the news to the four scenarios of the industrial network in the actuation times of the devices of protection, there is not considerable variation; this is justified by the current time graph because when there is a serious short circuit current, the action time should be shorter. On the contrary, when there is a small current time will be greater

How to Cite

1.
Cruz Gonzales AP, Salazar Defaz XS, Proaño Maldonado XA, Vásquez Teneda FH. Proposal for a protection system of an industrial electrical network. Data and Metadata [Internet]. 2024 Jun. 30 [cited 2024 Jul. 15];3:399. Available from: https://dm.saludcyt.ar/index.php/dm/article/view/399

The article is distributed under the Creative Commons Attribution 4.0 License. Unless otherwise stated, associated published material is distributed under the same licence.

Article metrics

Google scholar: See link

Metrics

Metrics Loading ...

The statements, opinions and data contained in the journal are solely those of the individual authors and contributors and not of the publisher and the editor(s). We stay neutral with regard to jurisdictional claims in published maps and institutional affiliations.